Local
SR 509 Southbound Off-Ramp to South Cloverdale Street Shut Indefinitely After Suspected Culvert Failure
State transportation officials have closed the southbound SR 509 off-ramp to South Cloverdale Street in south Seattle indefinitely after a culvert beneath the roadway may have failed, with no timeline for reopening.
SEATTLE â The southbound off-ramp from State Route 509 to South Cloverdale Street in south Seattle is closed until further notice after what state officials describe as a potentially failed culvert beneath the roadway.
The Washington State Department of Transportation confirmed the closure, and Washington State Patrol Trooper Rick Johnson said in a social media post that the ramp may have shut down because of a failed culvert. Neither agency has offered an estimate for when the ramp will reopen.
The closure, announced Friday, Nov. 27, 2026, removes a key exit for drivers heading into the South Cloverdale Street corridor, a route that serves nearby neighborhoods and local businesses in south Seattle. Commuters who rely on that off-ramp will need to use alternate exits and adjust their travel times until further notice.
Aging drainage infrastructure has become a growing concern across the region as heavier rain events and shifting weather patterns put added stress on culverts and stormwater systems. A culvert failure under a highway ramp can undermine the roadbed itself, which is why transportation crews treat such reports as a safety issue rather than a routine maintenance matter.
State officials have not released details on the condition of the culvert or what repairs might be required. The ramp will remain closed while engineers assess the damage and determine a course of action, according to WSDOT and WSP.
Drivers are advised to watch for updated signage and to plan alternate routes. This story will be updated as state officials release more information about the closure and the repair timeline.