Local
Matthews Intersection Where Child on E-Scooter Was Hit Slated for Safety Upgrades â But Not Until 2028
NCDOT plans new turn lanes, a crosswalk and better bike and pedestrian accommodations at McKee Road and Siskey Parkway, where a 12-year-old riding an e-scooter was struck by a car this month. Neighbors say the fix can't come soon enough and want a traffic signal, but construction isn't expected until fall 2028.
MATTHEWS, N.C. â State transportation officials are moving ahead with safety upgrades at the McKee Road and Siskey Parkway intersection where a 12-year-old riding an e-scooter was struck by a car earlier this month, but construction is still roughly two years away.
The child was taken to a hospital after the crash, which Matthews police said should serve as a warning to parents about the risks young riders face on busy roads.
The North Carolina Department of Transportation said plans to improve the intersection were already in the works before the collision. The project, targeted for 2028, calls for extended and new turn lanes along with better bicycle and pedestrian accommodations, including a crosswalk at the spot where the child was hit.
People who live and work nearby describe the intersection as a critical link connecting several neighborhoods to grocery stores, other businesses and recreation areas. Some said a crosswalk would help, but argued that only a traffic signal would make the crossing truly safe.
Lynda Carlson, who has owned a business in the McKee Farms shopping center since 2008, said she has watched more children take to e-scooters and e-bikes in the area.
"Kids ride around here like crazy and no one's paying attention to anything and there's a lot of traffic," Carlson said.
She said drivers turning in and out of the shopping center do not always watch for pedestrians or cyclists.
"At least a crosswalk, but I think a traffic light is mandatory," she said.
Divid Collins, a frequent McKee Farms shopper, said any crosswalk should include a push-button signal that flashes red so pedestrians can cross safely.
"It would need to be one of those maybe where you push the button and the light flashes red and the pedestrian can actually walk across," Collins said.
Even with the plans in place, the timeline means the intersection will remain largely as it is for at least two more years. NCDOT said right-of-way must be purchased and utility companies must relocate infrastructure before work can begin. The agency hopes to break ground by fall 2028.
"This is a common duration for a project of this scope, which as noted above includes much more than just a single crosswalk," NCDOT said in a statement.
The crash comes as communities across the Charlotte region grapple with how to accommodate a surge in e-scooters and e-bikes on roads designed primarily for cars. Cornelius police have stepped up enforcement against e-bikes and e-motorcycles on town roads, and Charlotte City Council has weighed new rules for the devices.
For families in Matthews, the wait for safer infrastructure is measured against the memory of a child hospitalized on a route many residents use every day.